Ruzhou: Promote full coverage of Beidou timing to ensure high-quality operation of the power grid
The time synchronization device has been successfully started and is running normally. Please check whether the protection and monitoring devices in the station are synchronized. On July 14th, with the successful acceptance of the replacement of the time synchronization device in the 35 kV Tiexi substation, it marks the successful application of the dual Beidou timing system in the substation. This is an important measure taken by Ruzhou Power Supply Company to improve substation operation and maintenance technology and ensure high-quality operation of power grid equipment.
It is reported that in order to further improve the safety and reliability of regional power grid equipment operation, Ruzhou Power Supply Company has upgraded and renovated the dual Beidou timing system of the substations under its jurisdiction. During the upgrade and renovation period, the company conducted a comprehensive and in-depth investigation and feasibility study of the power grid situation and load forecasting, organized substation operation and maintenance personnel to conduct on-site surveys, analyzed and summarized the “one station, one case” plan, and formulated detailed and feasible upgrade and renovation plans and schedules.
Strictly follow standardized operating procedures, strictly manage on-site safety, develop pre control measures for on-site work, ensure safe, high-quality, and efficient operations, and accurately complete system upgrades and renovations.
At the same time, strict control over the acceptance process, implementation of standard process equipment installation, precise calibration of cable laying fiber core direction, precise setting of parameter error range, ensuring high-quality production of timely equipment, lean operation, and comprehensive improvement of equipment health level. As of now, the company has completed the upgrade and renovation of the dual Beidou timing system in 11 substations.
Next, the company will continue to monitor the operation of power grid equipment, accurately control digital equipment information, keep up with the pace of the technological era, continuously optimize the Ruzhou power grid architecture, and provide stronger power support for the high-quality development of the region. (Han Xiaozhang Longhang)